{"id":2224,"date":"2026-10-21T07:58:16","date_gmt":"2026-10-21T07:58:16","guid":{"rendered":"https:\/\/www.openbox-codb.com\/?p=2224"},"modified":"2026-10-21T08:42:39","modified_gmt":"2026-10-21T08:42:39","slug":"le-vrai-cout-dun-projet-immobilier","status":"publish","type":"post","link":"https:\/\/www.openbox-codb.com\/en\/le-vrai-cout-dun-projet-immobilier\/","title":{"rendered":"The true cost of a property development project"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"2224\" class=\"elementor elementor-2224\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6c8ce050 e-con-full e-flex e-con e-parent\" data-id=\"6c8ce050\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-335b88e2 elementor-widget elementor-widget-text-editor\" data-id=\"335b88e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>You have confirmed the price of your building. Not the cost of your property development project.<\/p>\n<p>\u00a0<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><strong>Why is the initial valuation of an industrial site often incomplete?<\/strong><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>At the start of a project, the estimate focuses on the building itself. Items that are uncertain at this stage (taxes, utility connections, ICPE assessments, etc.) are often excluded from the scope.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>The result is that you don\u2019t have full control over the overall investment.<\/p>\n<p>\u00a0<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><strong>Where are the discrepancies hidden?<\/strong><\/p>\n<p><img decoding=\"async\" style=\"font-weight: bolder; background-color: transparent; width: 22px;\" src=\"https:\/\/s.w.org\/images\/core\/emoji\/17.0.2\/svg\/1f538.svg\" alt=\"\ud83d\udd38\" \/><strong style=\"background-color: transparent;\">Connections:<\/strong><span style=\"background-color: transparent;\"> A high-voltage electrical connection or a complex rainwater management system regularly costs more than \u20ac40,000.<\/span><\/p>\n<p><!-- wp:image {\"width\":\"22px\",\"height\":\"auto\"} --><\/p>\n<figure><img decoding=\"async\" style=\"width: 22px;\" src=\"https:\/\/s.w.org\/images\/core\/emoji\/17.0.2\/svg\/1f538.svg\" alt=\"\ud83d\udd38\" \/><strong style=\"background-color: transparent;\">Development Tax:<\/strong><span style=\"background-color: transparent;\"> For properties of 3,000 m\u00b2 or more, two instalments are due even before handover: 50 per cent in the 9th month and 35 per cent in the 18th month.<\/span><\/figure>\n<figure><img decoding=\"async\" style=\"background-color: transparent; width: 22px;\" src=\"https:\/\/s.w.org\/images\/core\/emoji\/17.0.2\/svg\/1f538.svg\" alt=\"\ud83d\udd38\" \/><strong style=\"background-color: transparent;\">Specific studies:<\/strong><span style=\"background-color: transparent;\"> Geotechnical, hydrological, and diagnostic studies; the initial budget does not account for the costly work that these studies will inevitably reveal (special foundations, retention basins, remediation, etc.).<\/span><\/figure>\n<figure><img decoding=\"async\" style=\"background-color: transparent; width: 22px;\" src=\"https:\/\/s.w.org\/images\/core\/emoji\/17.0.2\/svg\/1f538.svg\" alt=\"\ud83d\udd38\" \/><strong style=\"background-color: transparent;\">Areas related to the project:<\/strong><span style=\"background-color: transparent;\"> IT, relocation, change management, process analysis, mobility, renewable energy\u2026<\/span><\/figure>\n<p><!-- \/wp:list-item --><\/p>\n<p><!-- \/wp:list --><!-- wp:paragraph --><\/p>\n<p><strong>The Impact on Your Cash Flow <\/strong><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>These expenses are essential. They must be included in the budget from day one. An incomplete budget doesn\u2019t eliminate the expense\u2014it merely postpones it. And your financing plan must absorb it right in the middle of the project.<\/p>\n<p>\u00a0<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><strong>The \u201cOpenBook\u201d Model: Full Awareness of Your Expenses<\/strong><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>At OpenBox Co Design&amp;Build, we prioritize comprehensive financial modeling from the conceptual design phase onward: 100% of ancillary, regulatory, and tax costs are included in the financing plan.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>Our margins and actual purchase prices are shared openly with the finance department.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>Above all, we're here to assist you with all matters related to the construction process.<\/p>\n<p>\u00a0<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>Whether or not we include these services in our final proposal, you\u2019ll have a comprehensive and reliable overview of your actual expenses.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Vous avez valid\u00e9 le prix de votre b\u00e2timent. Pas le co\u00fbt de votre projet immobilier. Pourquoi la premi\u00e8re estimation d&rsquo;un site industriel est souvent incompl\u00e8te ?<\/p>","protected":false},"author":5,"featured_media":2237,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-co-designbuild"],"_links":{"self":[{"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/posts\/2224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/comments?post=2224"}],"version-history":[{"count":0,"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/posts\/2224\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/media\/2237"}],"wp:attachment":[{"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/media?parent=2224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/categories?post=2224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.openbox-codb.com\/en\/wp-json\/wp\/v2\/tags?post=2224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}